WEB3 / SAMPLE PROJECT

Follow the investment story
of a charging station.

How do project selection, fractional participation, operations tracking and period distribution connect? The illustrative example below walks through the eBattery model step by step.

ILLUSTRATIVE SCENARIO

This page is not a project open for sale. The amounts describe how the model works; they do not provide a return estimate or actual station performance.

Concept image representing a sample charging project
SAMPLE CHARGING PROJECT

A single-station project.
Defined participation units.

The example is explained with a gross funding of 20,000 CU, 10,000 equal-rights units and 2 CU per unit. CU is a shared example currency unit; it is not a sale price.

Example gross funding
20,000 CU
Equal-right unit
10.000
Sample unit price
2 CU
THE MODEL IN FIVE STEPS

Follow the relationship between the station and the rights holder.

STEP 1 / 5

What is being financed?

Before deciding to participate, you need to get to know the physical project. The site, right of use, energy connection, devices and the responsible operator should be explained together.

Site and demand

Why the station is planned at that location and how the usage need is assessed.

Budget and expenses

Installation, energy, maintenance, operating fee, charges and reserve approach.

Permit and rights documents

The project's permit status, the rights the units provide and the campaign terms.

HOW SHOULD YOU READ THE EXAMPLE?

The budget, the units and the period result are linked to one another.

The scenario below explains the model’s concepts using a single project. The figures are not an actual sales or return forecast.

  1. 01

    20,000 CU

    Illustrative gross funding amount.

  2. 02

    10,000 units

    Total units with equal rights in the example.

  3. 03

    100 units = 1%

    The example participant's entitlement ratio.

  4. 04

    1,900 CU × 1%

    19 CU from the example period pool.

CU is a sample currency. The funding amount and the post-expense period distribution are different calculations.
WHY DOES THIS STRUCTURE EXIST?

Use the example to learn the decision logic.

Separate funding from the period result

The 20,000 CU funding example describes the project's initial budget. The 1,900 CU distribution pool, on the other hand, is the result of a separate example period's revenue, expense, reserve and cash calculation. A monthly entitlement is not calculated directly from the funding amount.

Evaluate the unit ratio together with the pool

In the example, 100 of 10,000 equal-right units corresponds to a 1% ratio. When the eligible period pool is 1,900 CU, this ratio comes to 19 CU. The same number of units may produce a different result in another period; the calculation tool is meant for examining how this relationship changes.

NEXT QUESTION

If expenses change, the result changes too.

By changing revenue, expenses, reserve and cash needs, you can use the existing calculation tool to see how the period entitlement is affected.

NEXT STEP

Do you have a site or operating capacity?

Let's evaluate together how the example model could relate to your organization's needs.

Discuss project development ↗

Search eBattery

Search for a feature, guide or topic.

Starting pointsFinding a charging station →Sample RWA project →Guides and news →