22. eBattery Launchpad: Financing Station Projects
eBattery Launchpad is the platform layer where charging station projects under RWA meet investors, financing terms are disclosed and participation transactions are managed.
The function of the Launchpad is broader than putting a project up for sale. Reviewing the project, preparing the information to be presented to the investor, applying participation conditions, protecting funds and tracking installation progress are all handled within the same process.
In this structure, the investor participates in the economic rights of a specific station project. The station's location, technical scope, budget, operating model and the terms of participation in the net profit distributable after expenses are made accessible before the transaction.
The core principle of Launchpad is to establish a traceable link between the project described for the investment decision and the physical investment in which the collected funds are used.
This structure, designed as part of the Web3 development targeted for 2027, is activated with the legal scope in the relevant country in mind for project presentation, investment services, payment and custody functions. The process below describes the procedures the Launchpad follows from project acceptance to the start of operations.
22.1 Purpose and Scope of the Launchpad
The purpose of Launchpad is to enable station projects to access financing with understandable information and defined participation conditions.
The platform gives the investor a shared information structure in which to review the physical and economic scope of a project. Technical specifications, regional needs analysis, budget, unit structure and investor rights are linked under the same project ID.
The Launchpad scope consists of three main functions.
Project evaluation and information: The rationale, feasibility and investment conditions of the station are reviewed; an investor information package is prepared.
Participation and financing management: Participation of eligible investors, payment verification, temporary allocations, the financing target and sale closing are managed.
Installation and commissioning tracking: The use of the raised funds according to the disclosed stages, the progress of installation and the station’s start of operation are monitored.
Initial sale transactions are carried out under Launchpad. Reporting during the operating period, monthly distributions and supported secondary market transactions continue through other platform functions linked to the same project record.
What project acceptance means
A project being published on Launchpad means it has gone through the defined review and acceptance processes. This acceptance does not mean that a particular profit or investment amount is guaranteed to be recovered.
The platform's responsibility is to present accurately the scope of the review, the project terms and the information that affects the investor's decision. Estimates are shown separately from realized operating results.
22.2 Project Creation and Acceptance Criteria
Creating a project on Launchpad begins with defining the scope of the physical investment. Location, equipment, site relationship, connection conditions and the operating model are assessed together.
RWA projects that eBattery develops or builds within contractual collaborations are handled with the same core acceptance discipline. The project’s relationship with eBattery and the responsibilities of the relevant parties are clearly shown.
Main acceptance areas
| Acceptance area | Key element assessed |
|---|---|
| Physical project scope | A clear definition of the location, devices and service structure |
| Regional need | Rationale for the usage need the project responds to |
| Site relationship | Basis of the right of use required for installation and operation |
| Technical feasibility | Connection, capacity, installation and maintenance conditions |
| Economic structure | Funding target, budget, expenses and scenarios |
| Legal structure | Investor rights, operating authorities and project contracts |
| Data and reporting | A record-keeping system that allows operating results to be tracked |
| Continuity | Maintenance, renewal and the required reserve approach |
In the acceptance review, the stages that must be completed at the project's current readiness level are kept separate. A connection application is not presented as a granted connection approval, and a supply quote is not presented as a delivered device.
Separating project creation from opening for sale
Creating a project record on the platform does not mean that investment acceptance has begun. A project first goes through preparation and review processes.
The documents, checks and authorization conditions required to open the project for sale are met. If there are project steps that must be completed before installation, their impact on budget, schedule and resource use is explained in the information package.
Preserving the scope
Conflicting project records or undisclosed duplicate financing for the same physical investment are prevented. Financing obtained from other sources is shown in the budget together with its obligations, if any.
Significant changes within the project scope are reassessed for whether they affect the sale conditions.
22.3 Technical, Commercial and Legal Project Review
The Launchpad review consists of three complementary areas of assessment. Technical suitability, commercial feasibility and legal structure are addressed together on the same project.
Technical review
The technical review covers device selection, connection capacity, power sharing, site layout, communication infrastructure and maintenance access.
The on-site feasibility of the planned service is assessed. The hardware's nominal capacity is distinguished from the capacity that can be offered during operation. The data-providing capabilities of the devices and systems to be used are also compared against the reporting requirements.
Connection, procurement and field work that could affect the installation schedule are included in the project plan.
Commercial review
The commercial review assesses the rationale for demand, existing alternatives, pricing assumptions, operating costs and different usage scenarios.
The budget covers connection, installation, initial operating needs, reserves and platform fees in addition to the device cost. The date and scope of the quotes used are kept.
It is explained which data the revenue estimates are based on and under what conditions they may change. The initial funding source is not shown as the station's operating revenue.
Legal review
Legal review covers the country in which the project is offered, the right granted to the investor, the issuance and sales structure, the authorizations of service providers and the required documents.
Using an NFT or token does not by itself determine the legal nature of an economic right. ESMA’s approach is also to assess digital assets based on the rights and economic characteristics they carry.
A project owner presenting their own investment is not assumed to be the same activity as intermediating third-party projects. Indeed, for the purposes of European crowdfunding regulation, ESMA treats the situation of a project owner who directly offers only their own projects separately from a service that brings investors together with different project owners. This distinction does not remove other applicable obligations.
In eBattery's Launchpad structure, activity classification is based on the actual service and rights relationship, regardless of the commercial name used.
Management of conflicts of interest
The roles eBattery takes on as project developer, operator and platform provider are explained. Payments to the relevant parties and these parties' roles in review processes are kept visible.
The roles that prepare the project, check it and approve the use of funds are arranged with appropriate separation of duties. When an external expert review is used, the scope and date of the review are clearly stated.
22.4 Project Page and Investor Information Package
The project page is the main interface where the investor can review the station and the participation terms together. The information package contains the documents, calculations and contracts this view is based on.
The presentation does not rely on the investor making a decision by looking only at the unit price. The project’s overall structure, costs and economic rights are shown in an understandable way.
| Information group | Scope offered |
|---|---|
| Project ID | Station e-ID, location, scope and readiness status |
| Technical structure | AC/DC type, number of devices and sockets, capacity |
| Regional rationale | Demand analysis, existing infrastructure and data period |
| Financing | Gross target, number of units, sale price and allocation of funds |
| Economic right | Net profit participation, distribution structure and entitlement principles |
| Fees | Initial sale, operating and other related costs |
| Fund management | Escrow arrangement, terms of use and release stages |
| Process | Campaign period, closing conditions, installation and commissioning plan |
| Returns and changes | Provisions on failed financing, cancellation and material changes |
| Documents | Contracts, review references and version history |
Explaining the nature of the information
Estimates, offers, approvals and realized results are presented with separate labels. A future revenue scenario is not shown as if it were operating history.
Where images are representative, this is stated. A photo of an installed device is not confused with a design rendering.
Document version and investor approval
The version of the contract and information package that the investor accessed at the time of joining is recorded. Later updates are published while preserving their relationship to the earlier version.
Changes that materially affect rights, cost or project scope are not treated as simple content updates. The related notification, re-approval or other investor rights are carried out according to the applicable conditions.
In multilingual presentation too, economic rights and amounts are kept consistent. The contract language that is legally binding is stated in the relevant document.
22.5 Project Evaluation with Web2 Data
Launchpad links demand signals obtainable from eBattery’s Web2 layer to project evaluation.
Regional station searches, charging needs arising along routes, filter preferences and verifiable usage information may support the rationale for a project. This data is used together with field and economic assessments.
Separating data from assumptions
The analysis used on the project page states the observation period, the data scope and the method. The number of searches in the app is not shown as completed charging sessions.
The behavior of eBattery users is not presented as if it represented all electric vehicle users in the region. The platform's regional usage density and data sufficiency are included in the assessment.
From station need to project rationale
When a region has a service gap, it is explained in what respect the candidate project will fill that gap. Factors such as socket compatibility, power, access hours or deviation from the route are made concrete.
The share the new station may take from existing demand is separated from the additional service it will provide to the area. The same demand is not fully counted again across multiple projects.
Analysis history provided to the investor
The analysis version used during financing is linked to the project record. After operations begin, actual results can be compared with this initial assessment.
Public presentations use data that is anonymized and that may be shared. When the rationale for a project is explained to investors, drivers' personal movement history is not published.
22.6 Funding Target, Number of Units and Sale Price
The funding target is based on the total resources needed for the project to be carried out within its stated scope.
The gross target is calculated together with installation and connection spending, initial operating needs, required reserves, the initial sales commission and other relevant costs.
Explaining the unit structure
The total number of investment units for the project and the initial sale price per unit are determined and shown in the information package.
In the base structure made up of equally priced units:
Gross sales target = Number of units offered for sale × Unit sale price
If there are units allocated to the operator or to another party, their share within the total economic rights is explained separately. Investors can see what portion of the project’s total rights the units offered for sale represent.
The nominal unit price and the minimum participation amount are also shown separately. A low unit price does not mean unlimited participation regardless of transaction or country conditions.
Full financing approach
The basic model is that closing proceeds once the funding conditions required by the described project scope are met. It is not assumed that the same installation can be completed if the required funding is not reached.
If a phased or alternative project scope is offered, the budget of each scope and its effect on investor rights are disclosed before participation. Quietly reducing the scope or changing the distribution of rights at the end of the campaign is not practiced.
Oversubscription and allocation
The number of units offered for sale is kept as an upper limit. Excess demand does not automatically lead to additional units being created.
The allocation method is explained in the campaign terms. Amounts that are not accepted or that fall outside the allocation are not finalized as investment contributions.
The campaign duration, closing conditions and, where applicable, the early closing method are stated at the outset. These conditions are applied while protecting the rights of the relevant investors.
22.7 Retail and Professional Investor Participation
eBattery Launchpad aims to support participation by individual and professional investors within the scope of the relevant country and project conditions.
Participation is tied to identity and eligibility checks carried out through the investor e-ID. For institutional participants, the identity of the entity and the representation authority of the person carrying out the transaction are verified separately.
Participation flow
The user first reviews the project information, then completes the relevant eligibility and disclosure steps. The number of units they want to join with, the total payment amount and the transaction terms are shown clearly.
Before payment, it is stated which right will be acquired, which currency or digital asset the transaction will be made in and any additional costs. The user’s approval is linked to the relevant document version.
Investor classification
The definitions of retail and professional investors are assessed within the framework of the country and the product. Professional status is not accepted merely because a user ticks an option; the required conditions are verified.
Applicable participation limits, information or suitability assessments, and withdrawal or review periods are included in the transaction flow. The rules of a single country are not automatically applied to global users.
Pending transaction and finalized participation
Initiating a payment request does not mean the funds have been received in verified form. Until the bank or payment provider confirmation, chain confirmation and related checks are complete, the transaction is shown with its own status.
The user can see the difference between a pending payment, a verified contribution, a provisional allocation and a completed sale. Failed or duplicate payment requests do not lead to a second investment unit being allocated.
22.8 Safeguarding of Funds and Custody Structure
Launchpad’s approach to fund management is based on holding participation payments under defined conditions until the sale closes, and releasing them after closing according to the stated use plan.
Escrow — escrow — structure; it refers to the technical and legal arrangement that defines who the fund belongs to, under what conditions it can be used, and how it will be returned in the event of a refund.
Separate management of fiat and digital assets
Fiat currency collections are managed through service structures that hold the relevant payment and fund-protection authorizations. For digital asset contributions, the applicable custody model and contract controls are evaluated together.
Under European crowdfunding rules as well, payment services are a separate area of authorization; ESMA sets out the conditions for these services to be provided by an authorized provider, either directly or through a third party.
The structure eBattery uses is built according to the regime the project is subject to. A smart contract being able to hold funds is not treated as meaning that payment or custody authority exists automatically.
Separating project and platform resources
Participant funds are tracked in records that can be matched by project, investor and transaction. No undisclosed transfers of resources are made between eBattery's general operating budget, other projects and campaign funds.
Funds held before closing are not used for investments outside the project, lending, other transactions or seeking returns. The fund protection purpose disclosed to participants is preserved.
Legal segregation, custody responsibility and the rights in case the provider faces financial difficulty are set out in the contracts. Using a separate wallet or account does not, on its own, mean protection from bankruptcy or deposit insurance in every case.
Release controls
The stage at which funds may be transferred, the amount, and the recipient are defined. Critical transactions are carried out with segregation of duties and the required approvals.
On-chain administrator authorities, contract updates and emergency stop mechanisms are also part of fund management. These authorities are not designed as an unlimited and undisclosed way to withdraw resources.
During a security issue, new risky transactions are restricted while controlled processes are kept in place for managing refunds and obligations. Fund statuses, escrow records and payment records are compared through regular reconciliation.
22.9 Successful Funding and Completion of the Sale
A funding target being met on screen does not, on its own, mean the sale is complete. Closing is the stage at which the financial and legal conditions are verified together.
Closing checks
Before the sale is completed:
The verified status of accepted funds is checked.
Cancellations, withdrawals, overpayments and amounts outside the allocation are set apart.
Required investor eligibility and document approvals are verified.
The conditions required for closing the project are reviewed.
The final unit allocation and the overall rights structure are reconciled.
The commission and the amount to be allocated to the project are calculated.
Applicable waiting or withdrawal periods are taken into account in the closing calculation. Contributions that are reversible or unverified are not treated as a final source.
From provisional allocation to final entitlement
The participation record kept during the campaign and final investment unit ownership are managed separately. When the sale is completed, entitlement is linked to the relevant digital record and the investor account.
If a technical representation has been created before closing, its temporary nature and transaction restrictions are maintained. An incomplete participation is not presented as a finalized and freely transferable investment right.
Successful financing and service start
A successful close shows that the project has met its stated funding conditions. It does not show that the station has been physically installed or has started to generate revenue.
After closing, the project moves into the installation phase. The investor tracks the funding completion date and the commissioning and start of operations as separate statuses.
22.10 Refund When Funding Conditions Are Not Met
If the financing conditions are not met, participation records and protected funds are resolved according to the announced refund arrangement.
Failing to reach the required target by the end of the campaign period, not meeting the closing conditions, or the sale being canceled before closing are cases that may start the refund process.
Amount eligible for refund
The refund calculation is based on the verified and accepted participation amount. Amounts that have already been refunded or never collected are not refunded again.
No 3% primary sale commission is charged on failed financing. The refund status of third-party costs, such as network or payment provider costs, is shown in line with the terms disclosed before participation and the applicable rules.
Currency and asset type
The currency or digital asset on which a refund is based is clearly defined in the transaction terms. A refund of a participation made with a digital asset is not presented as the same commitment as preserving a certain fiat currency value.
If a fiat on-ramp was used, the on-ramp transaction and the refund of the investment participation may be separate processes. The user is told which transaction was reversed and which costs belong to the relevant provider.
Application of the refund
Refunds are made to a verified payment source or to a recipient who has passed the required checks. Requests to change an address or account are handled with verifications that prevent unauthorized redirection.
The user can track when a refund entitlement arises, and when the transaction is started and completed. The refund schedule and any required user steps are included in the campaign terms.
Project issues after closing
The financial consequences of failed financing before closing and of problems arising during installation after closing are separate.
It is not assumed that all funds used for installation can be refunded immediately in every case. In the event of cancellation or suspension after closing, unused resources, supplier refunds, existing obligations and the resolution provisions of the project agreement are assessed together.
22.11 Installation Stages and Controlled Use of Funds
Rather than transferring all the funds to the operating account without control once the sale is complete, the principle is that use of the funds is tied to the disclosed project stages.
Each release is supported by a budget item and supporting documents.
| Stage | Progress assessed | Basis for the use of funds |
|---|---|---|
| Procurement | Order and delivery terms | Contract, quotation, and related payment terms |
| Site preparation | Preparing the installation area | Scope of work, progress records and progress payment documents |
| Electrical and connection work | Implementing the planned infrastructure | Technical records and related checks |
| Equipment installation | Assembly and pairing of the devices | Delivery, serial number and installation records |
| Commissioning | Completion of testing and service readiness | Acceptance and verification records |
| Initial operation | Disclosed operating and reserve needs | Project budget and purpose of use |
Stage verification
Uploading a photo or changing a status field does not, on its own, show that an entire stage has been completed. The scope of the document, the party performing the transaction and the technical result are evaluated together.
For procurements that require an advance payment, which delivery obligation the payment corresponds to and the contractual protections available are explained.
Duplicate invoices and progress payments are checked so that funds are not released a second time for the same work.
Budget changes
When a cost increase or scope change occurs, whether the project can be completed with the remaining resources is reassessed.
A need for additional funds does not by itself change existing investor rights or the number of units. New financing and significant changes in scope are carried out through the relevant contract, disclosure and approval processes.
Payments to related parties are also subject to the same documentation and control framework. The boundary between project funds and eBattery’s general operating expenses is maintained.
Presenting progress to the investor
In the project view, the released amount, remaining funds, completed stages and the current schedule become traceable. The reasons for delays and their effect on later stages are explained.
This way, once funding is completed, the investor can regularly follow what stage the project is at.
22.12 Commissioning and Start of Operations
Commissioning is the stage at which the physical installation becomes a charging service that can be offered to users.
At this stage, along with the operation of the devices, connection, service permissions, session management, payment and data records are checked.
Service readiness
The station’s identity in the field and its device and socket records are matched with the digital passport. The map location, access information, operating hours, and the technical specifications shown to the user are verified.
Charging start, monitoring and stop flows are checked according to the scope of the relevant integration. Consistency between price display, collection and transaction history is also assessed.
User support, maintenance communication and the fault response arrangement are prepared for the start of operations.
Data and financial record preparation
It is verified that IoT and station management data flows to the correct project, that measurements match the relevant sessions, and that financial records can be created.
Test sessions are separated from commercial usage records. Energy or sample collections generated during testing are not reported as regular customer revenue.
Recording the start of operations
The date the commercial service begins is linked to the station e-ID and project history. The first reporting period takes into account the actual time since operations began.
A partial first month is not confused with full monthly performance. The first distribution also does not automatically take a fixed amount just because operations have started; the period calculation and the distributable net profit conditions apply.
With this stage, the project moves from installation tracking to regular operation, reporting and rights ownership management.
22.13 Primary Sale Commission and Onchain Collection
The primary sales commission of eBattery Launchpad is is 3% of the sales amount finalized at the close of a successful sale.
Commission is not considered earned on the basis of a pre-request, a payment not yet verified, or a provisional counter indicating that the financing target has been reached. The final sales amount accepted at closing is used as the basis.
Commission base
Amounts that are canceled, refunded, left unallocated or sent in excess are separated from the successful sale account. The commission base is reconciled with the accepted sale price of the units definitively allocated to investors.
Applicable taxes and other transaction costs are explained according to their own nature. The effect of the 3% rate on the budget is shown on the project page before participation.
For example, on a finalized gross sale of 20,000 dollars:
Primary sale commission: 20,000 × 3% = 600 dollars
Funds remaining for the project before other costs: $19,400
This calculation clearly shows that not all of the funding raised in the initial sale is allocated to installation expenditure.
Onchain collection
In the sales structure on the supported chain, separating out the commission is tied to verifying the closing conditions. The commission recipient, amount, asset used and transaction reference become traceable.
Processing the same closure again does not lead to a second commission collection. The commission record is compared against the investment unit allocation and the escrow balance.
In flows involving fiat collection, the on-chain collection is supported by an appropriate and authorized conversion or reconciliation process. Merely writing a record on-chain is not presented as money having actually been transferred to the bank account. The conversion’s amount, time, rate and related costs are matched across the records.
Separation from other revenue items
The primary sales commission is eBattery's Launchpad service revenue. It is not recorded as the station's operating revenue or as net profit distributable to investors.
The 1% fee on a secondary sale belongs to the relevant transfer transaction. The platform commission charged on profit distribution is 0%. The operating service fee is explained under its own terms within the project expenses.
This separation ensures that the investor contribution, eBattery’s service revenue and the resources set aside for the station’s use are tracked separately from the outset. All fund movements after the sale closes are tracked through the same project identity and budget relationship.
