19. RWA-Based Charging Station Model

eBattery's RWA-based charging station model brings together a physical station project, that project's operating activities and investors' economic participation rights in a shared record system.

At the center of the model is a real project providing charging service at a specific location. The project’s devices, power connection, site usage conditions, operating expenses and revenues are defined. Investor participation is structured around rights to the project’s distributable net profit after expenses.

Digital investment units make it possible to represent these rights and, under appropriate conditions, transfer them. While the station's activities are monitored through IoT and the related operating systems, financial results are verified against payment, accounting and document records. The onchain structure supports the traceability of entitlements and related transactions.

The core relationship of the model is the link between a defined physical project, a disclosed economic right and a verifiable operating result.

This section details the project, financing and operating structure on which eBattery’s RWA development targeted for 2027 is based. Each project is put into operation within the conditions of the country where the service is provided and the authorizations required for investment participation.

19.1 Definition of RWA within eBattery

RWA — Real World Assets — approach refers to the digital representation of rights relating to a real-world asset or activity.

Within eBattery, the subject of RWA is a charging station project with a defined scope. This scope includes the physical equipment, the related site and usage rights, the service capacity, the operating arrangement and the economic right granted to the investor, together.

The core right offered to the investor is the relevant project's is a right to participate in the distributable net profit. Entitlement is tracked through digital investment units linked to project documents.

This definition sets three important limits.

First, participation is project-based. The investor participates in the economic result of a specific station project. This participation does not by itself create a partnership in all of eBattery’s activities or in the company’s capital.

Second, the economic result arises from the operating activity. The revenue of the charging service, related expenses, taxes, reserves and distribution conditions are assessed together. The existence of a digital unit does not, by itself, create distributable profit.

Third, the scope of the rights is explained in advance. Provisions on the participation rate, distribution method, transfer conditions and continuity of operations are included in the project documents accessible to the investor.

Not every station shown on the eBattery map is part of the RWA model. Projects included in the RWA scope are clearly defined by their own digital identities and project documents. A third-party station discovered on the map and a station project that eBattery offers for investment participation are distinguished in the user interface and in the record structure.

19.2 The Relationship Between the Physical Station and Digital Investment Units

The physical station is the infrastructure through which the energy service is delivered. Digital investment units, in turn, represent the defined economic rights relating to that station.

Dividing a station into thousands of units does not mean the device is physically divided. The station continues to serve within its technical and operational integrity. What is divided is the economic participation right defined in the project contract.

Three levels of records are used together to establish this relationship:

Record level Content Function within the model
Physical station record Location, devices, sockets, connectivity and site information Defines the physical infrastructure on which the service is provided
Project record Budget, contracts, operating scope, revenue and expense relationships Explains the economic and legal limits of the investment
Digital investment unit record Number of units, ownership of rights, transfers and the distribution relationship Shows by whom and in what amount the economic right is held

e-ID as a shared reference

The station e-ID provides the link between physical and digital records. A charging session, maintenance record or device change is linked to the relevant station identity. Project documents and investment units are also defined within the same project relationship.

A station may have more than one charging unit or connector. In that case, it is explained which devices fall within the scope of the project, how their revenues are collected, and how shared expenses are allocated.

From the investor’s perspective, the project forms an economic whole whose boundaries can be understood. Including a socket, another device or later-added capacity in this whole requires the relevant change to be recorded.

Separating the entitlement from the authority to use it

Owning an investment unit does not give the owner the authority to manage the physical device, change the tariff on their own, or reserve the station for personal use. Day-to-day operating decisions are carried out within eBattery's service and operating responsibility.

The core relationship for the investor is economic participation and tracking of project information. If a charging discount or another usage benefit is offered, that benefit is explained under conditions separate from the investment right.

Preserving changes together with their history

If a device is renewed or the station is relocated, the physical information may change. The project’s history continues, with its link to earlier records preserved. The old device, new device, previous location and the effective date of the change are tracked in the same record history.

This method lets the investor understand which physical infrastructure's operating result they participate in during which period.

19.3 Link Between NFT and Token Representation and Economic Rights

In the eBattery model, the digital representation is used to record the station's identity and the investor's rights. The different purposes of these two elements are also preserved in the technical design.

The station identity defines a single project. Investment units, in turn, can be structured as quantities with equal economic rights within the same project. In a structure where units carry the same rights, each unit economically represents the same participation share.

In the Ethereum ecosystem, the ERC-721 standard defines the ownership and transfer structure of unique tokens, while ERC-1155 supports managing different token types and quantities within the same contract. These standards are technical means of representation; they do not by themselves determine the content of an investor's economic right or the legal authority of an activity.

The definition of rights on which the digital representation is based

For an investment unit to be assessed meaningfully, it must be linked to the following information:

  • The project and station identity it is linked to.

  • The scope of the economic right it represents.

  • Its share of the total rights.

  • Rules that will apply to the distribution account.

  • Ownership and transfer conditions.

  • Version of the relevant project documents.

  • The network and contract ID used.

This relationship makes visible which contractual right the digital record corresponds to. The presence of a token in a wallet and the scope of the right attached to it can be reviewed together.

Economic nature and legal assessment

The name NFT or token alone does not determine the regulatory framework an investment is subject to. In ESMA’s approach too, digital assets are assessed by the rights and economic characteristics they carry; the use of technology does not by itself change the nature of a financial instrument.

eBattery's model is based on aligning the technical standard with the legal definition of rights. Ownership, operation and investment participation documents keep their own functions. The digital investment unit is not presented as physical ownership or a company partnership right whose scope has not been explained.

Alignment of transfer conditions with the digital application

The transfer of an investment unit is carried out together with the participation and eligibility conditions of the relevant project. The aim is for the required checks to work consistently with the change in ownership of rights across the supported transaction channels.

For this reason, there must be consistency between a sale in the user interface and the on-chain transfer record. When the transaction is completed, the unit’s new rights holder must appear correctly in the relevant record system.

Contract updates and technical version changes are also made traceable. A change affecting the scope of rights is not applied merely by silently changing an explanatory text; the authorities and processes in the project documents are the basis.

19.4 Station-Based Project Structure

The station-based project structure determines the scope of the investment. Which equipment, revenues and expenses are included in a project is clearly defined.

In eBattery's approach, the project file is the main reference used from the investment decision through the operating period. The file brings together pre-installation information and the records created after operations begin in the same project history.

Physical and technical scope

The project's location, site usage conditions, AC or DC configuration, number of devices and sockets, planned capacity and connection layout are described. The technical scope is linked to the service it is intended to provide.

Where multiple devices are part of the same project, it is shown how they are included in the shared revenue and expense structure. The effect of later capacity upgrades on existing rights is also assessed according to the relevant project terms.

Legal and contractual scope

The party that holds ownership or the right of use of the physical equipment, the site relationship, the operator's responsibility and the economic right granted to the investor are explained.

Keeping a separate record for each project does not by itself create a separate legal entity or legal asset protection. The legal protection provided to the investor rests on the disclosed ownership and contract structure.

For this reason, the project file sets out clearly the legal structure used and which rights the investor has against which party.

Funding and use-of-funds scope

The total financing target, initial sale fees, the resources set aside for installation, the initial operating need and reserves are presented together.

Where they exist, the project's debts, collateral or other sources of financing are also included in the economic assessment. It should be visible which financial obligations affect the result attributable to the investor's share.

Revenue and expense limits

The project's revenues are associated with the activities within its scope. Expenses consist of items that support the operation of the relevant station and comply with the disclosed allocation rules.

If there are software, support or maintenance expenses serving more than one station, how shared costs are allocated across projects is explained. Expenses are not charged twice for the same activity.

Project-based reporting prevents the result of one station from being mixed with the performance of another station. Costs belonging to other projects are not shown as an expense of the project concerned.

Reporting and change management

The project file covers installation progress, operating periods, maintenance events, financial results and distributions.

Significant changes are recorded together with their effective dates and rationale. An investor can compare the project’s initial presentation with its current status; a secondary-market buyer can review the same history.

19.5 eBattery’s Role as Licensed Service Provider and Operator

In the model eBattery is aiming for, once the required licenses and permits are completed, the company operates as the legal provider and operator of the charging service. 2027 is targeted for the transition to this structure.

Operating a charging network in Türkiye and operating a station on site involve differently regulated roles. In EPDK’s statements, the licensed charging network operator is distinguished from the charging station operator, which can operate with a certificate obtained from that network. eBattery’s own licensed operating target is addressed together with the relevant network and station obligations.

Responsibility for service delivery

eBattery's operator role covers keeping the station ready for service, managing charging sessions, presenting price information, user support and the related operating records.

Device maintenance, site access, fault response and renewal plans are also part of this responsibility. Operating expenses are documented and tracked within the project economics.

Investors are not expected to carry out daily technical operations. Economic participation in the project is defined separately from the operator's operational responsibility.

Separate scopes of the license and the investment right

Acquiring an investment unit does not give the investor a share in a charging operator license. Transferring a unit also does not mean transferring the license or the operating authority.

Similarly, it does not replace the authorizations required for operating a charging network, offering an investment product or providing a secondary trading service. Launchpad and investment transactions are carried out with the operating conditions in the relevant country met separately.

Operating fee and accountability

The fee eBattery receives for its operating service is explained in the project documents on the basis of a rate or amount. This fee is taken into account as the relevant expense item in the calculation of distributable net profit.

The operating service fee and the primary and secondary sale commissions are recorded separately. This way, the investor can see which service each payment made to eBattery corresponds to.

Expenses belonging to the operator’s own services or to related parties are also tracked under the disclosed conditions and documentation arrangement. This approach makes visible the economic effect of eBattery’s different roles within the same ecosystem.

19.6 Investors' Right to Participate in Distributable Net Profit

The investor’s core economic right is to participate in the distributable net profit of the relevant station project. The calculation and distribution schedule is designed to run monthly.

The monthly period refers to the schedule used to determine operating results and calculate the amounts due to rights holders. Whether a distributable amount arises in each period depends on the station's realized results.

Determining revenue

Revenue is calculated from completed services within the project’s scope and the related commercial records. Refunds, discounts, cancellations and collection adjustments are taken into account.

The total amount collected from the customer and the amount recorded as the project’s revenue may not be the same. Relevant taxes and other financial items are separated according to applicable accounting and tax rules.

In this way, the income indicator shown to the investor is displayed with a note on which calculation scope it is based on.

Determining expenses

Project expenses cover energy, site rent or usage fees, maintenance, insurance, payment costs, operating services and other related documented operating expenses.

Depreciation, which affects the accounting result, financing expenses where applicable, and taxes are also assessed according to their own nature. The allocation of expenses across periods and of shared costs is applied using the disclosed method.

Reserves and distribution conditions

After the net profit calculation, the necessary offsets for prior periods, maintenance and renewal reserves, and amounts that must be set aside before distribution are taken into account.

The accounting effect of depreciation is kept distinct from the cash set aside for future renewal. Creating, using and the remaining balance of the reserve are tracked separately; the same transaction is not recorded in a way that would cause a duplicate deduction.

The distribution decision is assessed alongside the calculated result, the cash actually available and the relevant legal distribution terms. Revenue that has not yet been collected is not presented as a completed cash distribution.

Calculating the participation rate

In the basic model made up of units carrying equal economic rights:

Participation ratio = Number of units the investor is entitled to for the relevant period / Total number of valid participation units in the project

Investor's distribution share = Amount allocated for distribution × Participation ratio

This calculation uses the total number of units, the nature of the rights, and the entitlement method that applies to the period together.

In transfers made during a period, the entitlement date, the distribution right for completed periods and the scope of the rights passing to the buyer are applied according to the project terms disclosed before the sale. The same right for the same period is not distributed a second time to both the seller and the buyer.

If there are deductions that must be applied specifically to the investor from the amount to be distributed, they are shown separately in the relevant record.

0% platform commission on profit distribution

In eBattery’s defined model, no separate platform commission is charged on profit distribution. The 3% fee on the initial sale and the 1% fee on supported secondary sales belong to their own transaction types.

The operating service fee, on the other hand, is treated among the project's expenses. If there are other items such as network, payment or statutory deductions, these are also explained with their own nature and amount.

In this way, the investor can follow the relationship between the overall project result, their own participation share and the amount reflected in their account.

19.7 Funding and Unit Structure in AC and DC Projects

eBattery’s RWA model is designed to be applicable to station projects with different technical capacities. AC and DC projects are evaluated separately according to their intended use and technical requirements.

Charging time is affected by the device's capacity as well as the power the vehicle supports, the battery's current state of charge and other technical conditions. For this reason, the power value written on the station does not mean the same energy transfer will occur continuously in every session.

Evaluating AC projects

In AC projects, the parking duration of vehicles, the way the location is used day to day, the number of vehicles served at the same time and the connection capacity matter.

Service needs may differ in usage scenarios such as residential areas, workplaces, hotels or long-term parking. The project budget covers site preparation, electrical infrastructure, installation and operating requirements as well as the devices.

Evaluating DC projects

In DC projects, the aim can be to meet energy needs with shorter stops. This type of service is considered together with connection power, site access, vehicles' charge acceptance capacity, power sharing and maintenance needs.

In projects where multiple sockets share the same power infrastructure, total capacity and the power that can be delivered per socket at any moment are clearly separated.

Effect on financing design

Review area Elements considered in AC projects Elements addressed in DC projects
Use case Longer parking times and regular local use Shorter stops, a trip or heavy service needs
Technical capacity Vehicles' AC acceptance capacity and site connectivity Vehicles’ DC acceptance capacity, connection and power sharing
Installation budget Number of devices, cabling, site and connection work Power infrastructure, hardware, site and related electrical work
Operating analysis Parking time, energy sales and usage pattern Session density, energy sales, power usage and maintenance
Unit structure According to the project's total budget and rights allocation According to the project's total budget and rights allocation

This comparison makes it possible to evaluate the technical choice together with the financing and operating model. It is not assumed that every AC project has the same cost or that every DC project has the same revenue potential.

Determining the number of units

The total number of investment units is defined according to the project’s financing structure. It is not mandatory for every project to use 20,000 units or a unit price of 1 dollar.

The total number of units, the unit price and the economic right represented are explained together. So that users can make comparisons, not only the unit price but also the project’s total financing amount and the distribution of rights are made visible.

Whether it is AC or DC does not change the investor’s basic right definition. In both models, participation is based on the disclosed distributable net profit structure of the relevant project.

19.8 Example Model: A $20,000 Project and 20,000 Investment Units

The scenario below is prepared to illustrate the calculation of units, fees and participation rate. The amounts are illustrative; they do not represent the market cost or expected revenue of any specific station.

In the example, the project's the total gross funds to be collected from the initial sale: 20,000 US dollars is accepted. This amount is the financing target that also includes the initial sale platform commission.

Basic unit structure

Parameter Example value
Total gross funding target 20,000 USD
Total investment units 20.000
Unit initial sale price 1 USD
Initial sale platform commission %3
Economic structure of the units Equal participation right

The example assumes that all 20,000 units are issued and allocated to holders, and that all units carry the same economic rights.

Initial sales commission and project resources

First-sale platform commission:

20,000 USD × 3% = 600 USD

Resources remaining for the project budget after commission:

20,000 USD − 600 USD = 19,400 USD

Allocation of resources Amount
Total sale amount 20,000 USD
Initial sale platform commission 600 USD
Resources remaining for the project before other costs 19,400 USD

19,400 dollars is the amount that may be allocated to installation and other project needs within the disclosed budget. If there are payment, conversion, network or other transaction costs, these are also considered separately in the budget.

Covering the commission from the source does not by itself reduce the number of units allocated to the investor. In the example, an investor who acquires 1,000 units holds 5% of the total 20,000 units.

A case where a net $20,000 is needed for installation

If the station's installation and project needs require $20,000 net after commission, the gross funding target must be higher.

In the calculation that takes only the 3% initial sales commission into account:

Required gross funding = 20,000 USD / 0.97 ≈ 20,618.56 USD

In this scenario, the total number of units or the unit price is set to match the required gross amount. If other costs also need to be covered, they are accounted for separately.

This distinction makes it clear whether the phrase "20,000 dollar project" describes the total funding target or the net amount needed for installation.

Investor participation rate

Out of 20,000 equal units:

Units held Share of total entitlements
1 unit %0,005
100 units %0,5
1,000 units %5
2,000 units %10

These ratios show the economic participation the units represent. They do not express the station's periodic profit or the investor's annual return.

Showing the distribution account

To explain the sharing method without creating a revenue forecast, the calculation can be made on every 100 dollars set aside for distribution:

Units held Share of every 100 USD allocated for distribution
1 unit 0.005 USD
100 units 0.50 USD
1,000 units 5 USD
2,000 units 10 USD

The 100 dollars here is only the reference for the sharing calculation. It contains no assumption that the monthly distribution will be this amount.

Calculation precision and the handling of fractions are governed by the rules of the contract used. The rounding shown on screen is kept separate from the investor's recorded entitlement.

In the example, the US dollar is used as the unit of calculation. In real projects, the collection, reporting and distribution currencies, and the principles of conversion between them, are disclosed in the project terms.

19.9 Duration of Investment Rights and Operating Life

In the model eBattery has adopted, the investor's economic participation is designed to continue throughout the operating life of the relevant station project.

The operating life is not assessed as limited to the technical life of the single device installed at the start. Through maintenance, equipment renewal, and relocation under suitable conditions, the project can continue to provide service.

For this reason, the investment unit is not treated as a temporary right tied to how long a specific device serial number operates. The right is based on the activity relationship defined in the project documents.

Period during which the right holding continues

The investor takes part in the distribution account as long as they hold the unit and meet the entitlement conditions announced for the relevant period.

When a unit is transferred, rights relating to subsequent periods pass to the new rights holder according to the transfer terms. The status of distributions that were finalized before the transfer is also managed under the same rules.

Temporary maintenance, a fault or a service interruption does not end the units automatically. The effect of these periods on income and expenses is reflected in project reports.

Term and principal relationship

The basic economic structure of the model is participation in the result of operations. The initial sale price is not treated as an automatic receivable that will be repaid in the same amount on a certain date.

For the investor, a second-hand transfer is an exit route that may be available when a suitable buyer and transaction conditions exist. The sale price is determined by market conditions.

Mandatory termination

The operating target over the operating life does not constitute a guarantee of unlimited or uninterrupted operation. The termination provisions that will apply if continuing the project is not legally, technically or economically possible are set out in the project documents.

These provisions cover handling existing obligations, informing rights holders, preserving records and, where applicable, carrying out transactions on any remaining value in line with the applicable law and contractual arrangements.

19.10 Distinguishing the Sale of a Physical Station from the Transfer of an Investment Unit

In the eBattery model, selling a physical station and transferring an investment unit are different transactions.

Not offering the physical station for ordinary commercial sale is one of the model’s core principles. The aim is for the station to keep producing service and keep sharing the operating result with rights holders.

A secondary-market transfer of an investment unit, on the other hand, changes the economic rights holder while this activity continues.

What changes when an investment unit is transferred

In a transfer, a given number of investment units is passed to an eligible buyer. The economic scope of the units within the overall project is preserved; the holder of those units changes.

This transaction:

  • It does not mean the station is sold physically.

  • It does not by itself change eBattery's operational responsibility.

  • It does not constitute a transfer of the station's license or site-use relationship.

  • It is not recorded as revenue the project earns from charging activity.

The secondary sale price is the consideration for the transaction between the transferring investor and the new participant. In supported sales, a 1% platform commission is applied according to the disclosed transaction terms.

Continuity of service

While units change hands, the starting point is that the station's normal service operation continues. Drivers' charging experience is run independently of transfer transactions between investors.

Periodic entitlement records are updated in line with transaction time. A finalized distribution entitlement, a pending distribution and a next-period entitlement are kept separate.

Scope of the hardware renewal

Replacing a faulty device or one that has reached the end of its economic life is not the same as commercially selling the physical station project. Recovery or disposal of old equipment may be part of the renewal activity.

Costs incurred in this process and any related revenue are recorded in the project records. Changes affecting the project's economic scope are managed according to the rules disclosed to rights holders.

19.11 Renewal, Transfer and Continuity of Rights

Long-term charging operations require adapting the physical infrastructure to changing conditions. eBattery's model is based on managing these changes while keeping the link to investor rights.

Device renewal

The need for renewal may arise from technical failure, access to spare parts, efficiency, safety or economic life.

When new equipment is chosen, the existing site, electrical connection, vehicle compatibility and usage needs are assessed. The cost of the change and its expected effect on service are explained in the project record.

Expenditures covered from the renewal reserve are tracked together with reserve movements. If another source of financing needs to be used, its conditions and its effect on existing rights are addressed separately.

Relocating the station

If the site agreement ends, access conditions change or the current location becomes unusable, a relocation option may be considered.

A relocation decision is examined in terms of the new location's suitability, permits, connection capacity and economic conditions. Closing out the rights at the previous site and establishing the operating conditions at the new site are planned together.

The project history preserves the link between the previous and new location. Service interruptions and costs arising during the relocation process are reflected in the relevant period reports.

Preserving units and participation ratios

Renewal or relocation does not lead to existing investment units being canceled automatically or participation ratios being changed silently.

Issuing additional units, new borrowing or any other transaction affecting economic rights is assessed separately from routine technical updates. Such transactions are subject to the authority, disclosure and approval processes defined in the project documents.

The link between the investor's rights and the continuity of the physical service is shown clearly in the change records.

Event-based record

For every significant renewal or relocation, the reason for the change, its date, cost, affected assets and return-to-operation status are recorded.

This way, the investor can understand the reason for a change in period results. It can be separated out whether a lower distribution comes from maintenance spending, reduced usage or a temporary closure.

19.12 The Project Life Cycle from Funding to Operation

In eBattery's RWA model, a project has a life cycle that begins before the sale of investment units and continues throughout operation.

Each stage produces the information and responsibility needed to move to the next stage. Funding, installation and operating records are linked under the same project identity.

Stage Core activity The record or result created
Identifying the need Reviewing regional demand and existing service Project rationale and candidate location
Feasibility Site, connection, technical capacity and cost analysis Feasibility and budget assessment
Setting up the project structure Defining ownership, use, operation and investment rights Project documents and responsibility arrangement
Digital identification Linking the e-ID, the unit structure and the relevant contracts Verifiable project and rights record
Launchpad presentation Disclosure of information, budget and participation conditions Project view the investor can review
Financing and sale closing Checking suitable participation, allocation and use-of-funds conditions Finalized financing and rights ownership
Installation Procurement, field work and connection processes Expense documents and installation progress
Commissioning Technical, operational and data flow controls Station ready for service
Operations and reporting Charging service, expense tracking and period accounting Operating and financial results
Distribution and transfer Distribution by rights and supported secondary-market transactions Current entitlement and transaction records
Renewal and continuity Maintenance, equipment replacement or relocation Updated physical scope and uninterrupted record history

What the funding close means

A participation request being created on the Launchpad does not mean the project’s installation has been completed. Financing closing is the stage at which the announced sale and use-of-funds conditions have been met.

The successful first-sale commission is linked to this transaction. The refund, cancellation and other processes that would apply if financing is not completed or the project cannot proceed under the stated terms are presented before participation.

The use of funds is linked to the budget and project phases. Installation payments and progress records allow the investor to follow the process after funding.

Commissioning and the start of actual operation

Placing devices on site and the station being ready for service are different stages. The electrical connection, required permits and checks, session management, payment flow and data records are verified together.

The date the station starts providing service is recorded as the start of the operating period. A project in the installation phase is not reported as if it had the performance of an operating station.

Regular operating cycle

After operation begins, energy measurements, sessions, collections and expenses are processed regularly. The monthly period statement is prepared, entitlement conditions are applied, and the amount set aside for distribution is shared according to the relevant records.

Maintenance, correction and renewal events that occur during operation are added to the same project history. Users making secondary transactions can also review this history through the accessible project data.

Throughout the project's life cycle, the physical status, economic result and digital rights record are kept up to date together. This integrity forms the basic operating order on which investment participation rests in eBattery's RWA model.